Question- Railway Bridge

1➤ Weep holes are provided in

2➤ Pipe culvert is a/an

3➤ IS code for Steel structure is

4➤ The height gauge needs to be provided in

5➤ The minimum vertical clearance in RUB in urban areas where double decker buses p

6➤ The minimum vertical clearance above R.L. to bottom of ROB near the yard shall b

7➤ Steel channel sleepers are provided in bridges with superstructure of

8➤ The guard rail is provided in bridges to

9➤ The level of guard rail in bridges shall not be lower than that of running rail

10➤ The horizontal clearance between guard rail and running rail in BG track is

11➤ Minimum length of steel channel sleeper in BG

12➤ Corrosion in Steel girder bridges may be prevented by

13➤ Rail joints should be avoided within .......... of a bridge abutment.

14➤ Length of guard rails to be bent so as to be brought together at the middle of

15➤ Rebuilding of Railway bridges can be done by providing

16➤ Foundation and substructure of the bridge should be inspected by SSE/P-way/work

17➤ ORN stands for in the Numerical Ration System is

18➤ URN stands for in the Numerical Rating System is

19➤ For a major bridge, the URN would comprise of

20➤ In case of LWR track, full ballast section as specified in LWR Manual should be

21➤ For Box Culverts, Danger level is to be taken as

22➤ Periodicity of Underwater inspection for identified bridges

23➤ Flood level gauge to be marked in

24➤ Rail Cluster, as temporary arrangement is generally used up to a span of

25➤ The minimum vertical clearance of foot over bridge gangway is

Your score is

1 Comments

  1. periodicity of under water inspection of bridges should be 02 year as per my knowlwdge.