RAILWAY ENGINEERING • KNOWLEDGE • LEARNING Technical discussions, notes & railway insights

Tecnotips for Railway

Railway technology, Permanent Way, bridges, rolling stock, operations & discussions

Welcome to Tecnotips for Railway

Explore railway engineering. Share technical knowledge.

Articles, operational notes, and discussions covering railway track, Permanent Way, bridges, machines, and service rules.

🛤 Track & Permanent WayTrack standards, LWR, points & crossings 🌉 Bridge EngineeringInspection, maintenance & structures ⚙️ Railway MachinesTrack renewal & mechanised maintenance 🗂 EstablishmentService rules & employee information

Latest Posts

Sunday, December 7, 2025

Toe Load Measurement in Railway

Toe Load:

Toe load in railway engineering is the continuous downward force exerted by an Elastic Rail Clip (ERC) onto the rail's foot, holding the rail securely to the sleeper (like concrete sleepers), ensuring track stability, rigidity, and resistance to rail creep (longitudinal movement). It's a critical measurement for track maintenance, as reduced toe load indicates worn components (clips, pads, liners) and a potentially loose fastening system.

Importance of Toe Load Measurement: 

Measuring toe load helps determine if the ERCs are effectively holding the rail. Loss of toe load can indicate wear on the rubber pad or liner, or issues with the ERC itself, potentially compromising the track's stability. Toe Load Measuring Devices (TLMDs): Devices like the Electronic Toe Load Measuring Device are used to measure toe load. These devices typically engage with the ERC's toe and measure the force required to lift it, providing a reading of the toe load. Toe load is typically measured using a Toe Load Measuring Device (TLMD), which can be either mechanical or electronic. 

 1. Mechanical toe load measuring device:

This device consists of a pre-calibrated helical spring, a pointer, a lever arrangement with a link hanger, and a steel tong for gripping the ERC. The device is placed with one leg on the rail head and the other two on the sleeper. The steel tong is engaged with the toe of the ERC. A rotating handle is turned to compress the spring and lift the toe of the ERC until a gap is created between the toe and the rail foot or liner. A feeler gauge is used to confirm this lifting point. The displacement indicated by the pointer on a graduated scale, multiplied by the spring constant, gives the toe load in kilograms. Testing Frequency: Toe load measurements are typically taken periodically, with a frequency determined by factors like traffic volume and corrosion potential. For example, in the Indian Railways, toe load measurements are often taken every four years or after passage of 200 GMT of traffic, whichever is earlier. In corrosion prone area, the initial testing of ERC is to be done after two years or passage of 100 GMT, whichever is earlier. If 20% or more of sample size records toe load below 600 kg, both frequency of inspection and sample size are to be doubled. Sample Size – Toe load of elastic rail clip should be measured on 1% of ERCs randomly on every 100 sleepers (all 4 ERCs to be measured on one sleeper). 
 Operation:
  • Place the device with one leg resting on the rail top and the other two legs resting on the sleeper surface. 
  • Adjust horizontally the base plate by means of the nut of levelling leg. 
  • Turn the handle continuously till air gap is created between rail flange/top of liner and toe of clip. Introduce a filler gauge of 0.1 mm thickness in the air gap created between the toe of the clip and the rail flange / top surface of liner . Operation…..
  • The handle is then turned anticlockwise so that the filler gauge comes under a normal pressure. Turn the handle again clockwise and simultaneously pull out the filler gauge. The filler gauge when moves indicates the lifting of toe of clip. 
  • At this stage note down the reading on the graduated scale which when multiplied by the spring constant gives the toe load exerted by clip on the rail foot

2. Electronic Toe Load Measuring Device :

An Electronic Toe Load Measuring Device is a specialized instrument for railway maintenance, using electronic sensors (like load cells) to precisely measure the clamping force (toe load in kg) of Elastic Rail Clips (ERCs) directly in the field, providing digital readings for accurate track upkeep, ensuring rail stability, and replacing older mechanical methods for faster, more reliable data.

How it Works (General Principle):

  • The device's tong engages the toe of the elastic rail clip.
  • A load cell or hydraulic sensor measures the force applied or released as the clip is manipulated.
  • This force is converted into an electronic signal and displayed as the toe load (in kg).

Wednesday, January 10, 2024

Digitally Sign an Adobe PDF File

You can use a digital signature to comply with the most demanding legal and regulatory requirements because it provides the highest level of assurance about each signer’s identity and the authenticity of the documents they sign.

digital sign in pdf

To digitally sign a PDF file install Adobe Acrobat DC sfotware from App Store in PC. When using Adobe Acrobat, after an electronic signature has been added to the PDF file the file is no longer able to be edited. For this document, you can digitally sign and continue to edit the file by following the below steps:

  1. Open the PDF file in Adobe Acrobat.
  2. In the upper right-hand corner, click on Tools.
  3. Select the option Certificates.
  4. Navigate to the signature line that you are wanting to sign.
  5. At the top of the page click on Digitally Sign.
  6. Click and drag your mouse cursor above the signature line to create a textbox.
  7. A pop-up box will appear. If you already have a Digital ID that you would like to use, click the Continue button. Otherwise, click the Configure New Digital ID button to create a Digital ID.
    • If creating a new Digital ID, select the Create a new Digital ID option and then click Continue.
    • Select how you would like to save the Digital ID: Save to File or Save to Windows Certificate Store (recommended). Then click Continue.
    • Enter your name and email address, then click Save.
    • Select your newly created Digital ID and then click the Continue button.
  8. A pop-up window will appear showing a preview of your digital signature. If you would prefer, you can keep the Digital ID as how it appears, or you can click the Create button in the upper right-hand corner to customize a signature.
  9. Please make sure that the Lock document after signing option is left UNCHECKED.
  10. Then click the Sign button.
  11. A pop-up window will appear of your files area to select where to save the file. Select where you would like to save your file to your computer and rename your file if necessary.
  12. The digital signature should then appear on the PDF file and you should also be able to continue editing the file if necessary.

FAQ about Digitally Sign on PDF File-

Q ➤ Can I edit a PDF that I signed?


Q ➤ Is there a way to retrieve the unsigned PDF and resign it?


Q ➤ What if a PDF is locked after signing?


Q ➤ What are the scenarios in which a PDF is locked?


Q ➤ What if multiple signatures are needed and the PDF is locked after the first signature?


Q ➤ How to handle such issues better in future?


Sunday, December 11, 2022

Plasser's Quick Relaying System (PQRS)

It is essentially a semi-mechanised system of track renewal. PQRS consists of self propelled cranes which move on an auxiliary track of 3400 mm gauge having the same centre line as that of track to be relayed. These portal cranes are capable of self loading and unloading from BFRs. PQRS has following components-

irwcms
  1. Side Frames:-The machine contains two vertical side frames that house two vertical sliding frames.
  2. Bridge:- Sliding frames are joined together with horizontal cross frame known as bridge. The Motive Power, hydraulic and electrical assemblies are installed over the bridge. The whole bridge is raised/lowered to facilitate lifting of panels.
  3. Sleeper Gripper:- On the underside of the bridge, grippers to pickup sleepers is provided. Gripping of sleepers by its end is done by two angles welded to the grippers.
  4. Rail Clamps:- On the end side of the frame scissors type clamps are provided to hold the rails/panels.
  5. Turn Table:- To facilitate turning of portal cranes for placing it on the BFR and off tracking in mid section, a turntable is provided. On the BFR a wooden platform is provided to support the turntable.

Earlier, Portal cranes of model PQRS 2000-I has capacity of lifting maximum 5 t load. Maximum length of only 9 meter of prefabricated panel with PRC sleepers can be lifted by one portal crane. The later model PQRS 201 has capacity of lifting upto to 9 t. One such portal crane can lift 13 m long prefabricated panel with PRC sleepers.

    General Data PQRS-2000-I,PORS-201
    Engine: Deutz. Make 4 Cylinder 44 HP diesel engine Kirlosker Make air cooled HA-694, 75 HP
    Drive: Hydraulic
    Speed: 10 kmph-14 kmph
    Lifting capacity: 5 tonnes-9 tonnes
    Overall length: 2914 mm-3050 mm
    Overall width: 3860 mm
    Overall height above rail top: 4400 mm-4390 mm
    Wheel base: 2400 mm-2400 mm
    Wheel dia: 450 mm-450 mm
    Weight 10 tonnes-12 tonnes

Briefly the sequence of operation for relaying with PQRS is as under:

Panels are fabricated with new sleepers and service rails in a Base Depot. These panels are loaded on BFRs in 3 or 4 layers. The existing rails in track are cut in lengths of 13 m.

Auxiliary track is laid to proper line and level with the new rail panels, if rail renewal is also to be carried out as part of track renewal. Otherwise, service rails are used for making auxiliary track.

PQRS rake is brought to site of relaying after getting proper traffic and OHE block.

Following three methods of laying of new panels are used depending upon site conditions:

- Pulling the PQRS rake
- Pushing the PQRS rake
- Parting the PQRS rake

Portals are unloaded on the Auxiliary track.

Old panels are removed and loaded on PQRS rake, ballast bed is scarified manually and new panels are laid at site by using portal cranes.

Proper ramp is provided at the beginning and at the end of the day's work.

Sunday, July 24, 2022

Leave Encashment

WHILE IN SERVICE

On implementation of 6th PC, provision of Leave Encashment while in service has been introduced subject to following condition.
  1. Leave encashment will be subject to maximum 60 days in entire service.
  2. Maximum up to 10 days in one occasion, debited in the LAP A/c.
  3. Minimum balance of Leave in the A/c should be 30 days after encashment.
  4. One should avail his Pass on this A/C for getting the benefit of encashment.
  5. Encashment will be permissible every alternate year only.
  6. The encashment will not be deducted from the balance at the time of encashment on Retirement A/c i.e one can avail a maximum of 300 (on Retirement) +60 days (on Service) encashment in his entire service.
  7. Not entitled for HRA & Transportation allowance. ( R.B.L.No: F(E)III/2008/LE-1 dt. 8.10.08 RBE.NO: 161/2008)

Process

  1. Board has clarified that the PTO also includes in the term of “Passes” for availing the Leave Encashment. (RBE NO: 194/2008 dt. 3.12.09)
  2. Board further clarified that staff who are directly related with running of trains viz Drivers, Guard etc & SM’s ,ASM’s should be exempted from availing of 10 days leave & Pass/PTO to encash their Leave. (RBE NO: 196/2008 dt. 12.12.08)
  3. It has been decided to permit Rly. Servant to encash LAP upto 10 days without any linkage to the number of days & nature of leave availed at the time of availing Pass/ PTO. ( RBE NO: 14/2009 dt. 11.06.09)
  4. It has been decided to withdraw the exemption granted vide Letter dated 12/12/2008 with immediate effect. Accordingly hence forth the category of running staff, ASM etc. shall also have to fulfill all the conditions prescribed for railway employees for the purpose of availing Encashment of LAP upto 10 days while availing passes/ PTOs. (RB L. No. F(E)III/2008/LE-1/1 dtd. 01/09/2009)
A Railway Servant who proceed on or commuted leave is entitled to leave salary equal to pay drawn immediately before proceeding on LAP. On half average pay or LND is entitled to leave salary equal to half the amount as detailed above. On extra ordinary leave he will not entitled to any leave salary.

CASH EQUIVALENT OF LEAVE SALARY (DEATH)

In case of death while in service the cash equivalent may be granted to deceased employee’s family without any reduction leave admissible to him not exceeding 300 days on last pay drawn basis.

ON RETIREMENT

  1. It has also been decided by the President that the existing provisions of Railway Servants may be modified as follows in respect of Railway Servants.
    • The benefit of leave encashment of unutilized leave on average pay shall be payable upto maximum 300 days.
    • retirement on superannuation.
    • cases where the service of a Railway Servant has been extended in the interest of public service beyond the date of retirement on superannuation.
    • Vol. Retd Pre-matured retirement.
    • Railway Servant are terminated by notice or by payment of pay and allowance in view of notice or otherwise in accordance with the terms of his appointment.
    • Termination, re-employment
    • Death of Railway Servant while in service.
    • LPR on retirement.
    • Transfer of Railway Servant to an industrial establishment.
    • On absorption of a Railway Servant in a central public sector undertaking autonomous body etc.
  2. A Railway Servant who resigns or quits service shall be entitled to cash equivalent in respect of LAP at credit on the date of cessation of service. to the extant of half of such leave at his credit, subject to a maximum of 150 days. (RB No. E(E)III/97/LE-1/3 dated 10.11.19970 ).

All Railway Servant who retired on or after 30.09.1977 may be paid equivalent to leave salary for leave on average pay at their credit at the time of retirement. It shall be limited to maximum of 240 days LAP upto 30.06.1997 which is be raised to 300 days w.e.f. 01.07.1997. It may be paid as one time lump sum payment on settlement. Authority competent to grant such suo-moto issue order for granting LAP at credit on the day of retirement. In case of compulsory retirement under D&AR and pension as a consequence is reduced then leave encashment is not payable. A Railway Servant who resign or quits service shall be entitled to cash equivalent in respect of half the LAP at credit on the day on cessation of service to the extent maximum of 150 days. (RB No. E(P&A)1-98/CPC/LE-6 dated 25.05.1999 & E(P&A)1-98/CPC/LE-6 dated 01.10.1999)

Consequent upon the decision taken by Government on the recommendation of 6th CPC relating to encashment of leave in respect of both earned and HAPL shall be considered subject to over all limit of 300 days. The cash equivalent payable for HAPL shall be equal to leave salary as admissible for HAPL + DA, without any reduction on account of pension or other retirement benefits. The order shall take effect from 01/09/2008.(RBE No. 148/2008 dtd 08/10/2008)

Wednesday, February 23, 2022

HRMS for Railways Employees

Website address: https://www.hrms.indianrail.gov.in/HRMS or download HRMS App from Google Play Store

hrms

TO Know Your HRMS ID: Open HRMS Log-in page. Select Need Help for Login-enter your IPAS 11 digit Employee Number (PF Number)- Click on Go to View HRMS details.

Forgot Pasward: Open HRMS login page select Forget Password- Enter your 6 digit HRMS ID - Click on Send OTP- Enter 5 digit OTP received in your register Mobile Number- Click on Password Reset - Set New Password and confrim.

Procedure to use different modules in HRMS application

Login with HRMS User ID and Passworad along witah OTP received on register mobile number

e-PASS

Select➞Pass

Select ➞ Family Declaraton

Select➞Click on for Pass option to each member of family and Submitfor verification.

Select➞Pass Set List

Select➞Confirm if manual Pass availed entry details correct

Apply New Pass Application:-

Select➞Pass Set List

Select➞Type of Pass- Click Go

Select➞on Available passes Full Set or Half Sets

Select➞New Application

Enter: Outward journey from-to stations and add Break Journey station

Select➞Member to be included and submit for check of Pass Clerk & Pass Issuing Authority

View Issued Pass/PTOs

Select- My Issued Passes to view pass and PTOs.

PF-Loan

Select➞loan & Advances

Select➞My PF Application

Select➞New Application

Select➞Withdrawal Type

Selet➞Withdrawl Reson

Enter➞Applied Amount

Enter➞No. of Installment (if Temporary Loan applied)

Enter➞Remarks

Upload if documents required and click on "Submit" for further process

To view Status

Select➞Loan & Advance

Select➞My PF Application

View " Current Status" in the details against your Application No.

ESS - Employee Self Sevice

Select➞IRHRMS-ESS

Select➞View/Edit My Details

Select➞Required Tab for correction and click on "Go" to view details

Click on "Raise Change Request"

Type the Reason for Correction

Click on check box on the right side of the field

Make the correction which required

Upload the required documnents

Click on➞"Submit" button

To view Status

Note: Upload document should be in PDF format less than 2 MB and photos in JPG format

Use Employee ESS Module

Emploee Master

  • Basic Information
  • Family
  • communication Information
  • Personal
  • Qualificaton

e-SR

  • Initial Appointment
  • Awards
  • Promotions
  • Transfer
  • Nominations
  • Training Details
  • Publication Details
  • Deputation Details

For correction in Employee Current Status and Pay change history please contact concerned Dealing Clerk.

For any further information please Contact your Staff Welfare Inspector.

*How to upload Photo and Signature*

  1. Log into the HRMS portal
  2. Go to Employee Self Service (ESS)
  3. Employee Master
  4. Edit My Details
  5. Scroll down and click on *Photo & Signature*
  6. Click on *Edit Details* (below the left corner)
  7. Click on check box of photo and signature and upload photo and signature separately.
  8. Submit
For more detils in HRMS Application: Click on "HELP" & "FAQ" located at top of Right-hand Side.