MCQ - USFD

1➤ The technique of working used in ultrasonic testing for the design of equipment on the Indian Railway is................

2➤ SSE/P-way (In-charge ) shall check the work of SSE/P-way/USFD at least once in ............... round of testing or as specified by higher authority.

3➤ USFD test check by ADEN once in ............... minimum .............. hours during regular trolley inspection.

4➤ Initial course duration of JE/SSE/USFD is ............

5➤ Refreasher course duration of JE/SSE/USFD is............... weeks.

6➤ Material defects originating during the manufacturing process of Rails...........

7➤ Defect associated with faulty welding............

8➤ In AT welds due to improper welding may introduce a variety of defects on the joints as well as in the heat affected zone (HAZ) ..............

9➤ In codification of Rail defects or failure code 211 stands for.............

10➤ In codification of Rail defects or failure code 212 stands for............

11➤ I condition of rail defects or failure code 421 stands for ..........

12➤ Marking of USFD defects done with............ Color paint.

13➤ Marking of Rail defects/flaws with red paint in USFD testing for OBS/OBSW...........

14➤ Marking of Rail defects/flaws with red paint in USFD testing for IMR/IMRW

15➤ After marking USFD flaw as IMR/IMRW, who will impose SR30 kmph immediately?

16➤ OBS/OBSW, USFD marks to be watched during daily patrolling till it is joggled fish plated by whom?

17➤ The assessed service life pf T-12, 52 kg, 72 UTS Rail in terms of GMT is..................

18➤ The assessed service life of T-12, 52 kg, 90 UTS Rails in terms of GMT is................

19➤ The probes used in USFD testing of welds are..............

20➤ USFD testing is a .............. type of testing

21➤ In USFD testing ............ rail tester is capable of testing only one of the rails at a time.

22➤ In USFD testing of Rails the defects are classified as.........

23➤ Every new SKV weld should be tested............. after welding

24➤ SFD SPURT car tests both the rails with the speed of........

25➤ Symbol for marking of USFD defect "DFWR" With red paint

Your score is

2 Comments

  1. If anyone disagrees with the answer to any question, it will be resolved quickly.

    ReplyDelete
    Replies
    1. Anurag ShrivastavaMay 12, 2023 at 8:31 PM

      q no 7 and 8 ,please check ans

      Delete

Don’t hesitate to reach out with the comment above. Your email address will not be published.